L&T secures order for 300 MW battery storage project in Gujarat
Our main story on this: L&T secures Gujarat battery storage project worth up to Rs 2,500 crore
The company's Renewables and LTEPS units will develop a 900 MWh system at Khavda.
Larsen & Toubro (L&T) on Wednesday announced that its Renewables and L&T Electronic Products & Systems (LTEPS) divisions have been awarded a contract to build a battery energy storage system (BESS) at Khavda in Gujarat. According to Business Standard, the order is valued at up to ₹2,500 crore.
The project will feature a power capacity of 300 MW and an energy storage capacity of 900 MWh. This three-hour system is designed to capture extra renewable electricity during high generation periods and supply it when demand peaks.
The facility will utilise liquid-cooling technology. This method is intended to provide better power density, increased safety, and a longer operating life for the battery installation, as reported by The Economic Times.
The system is expected to assist in integrating renewable energy into the Indian power network by adding flexibility to the grid. It aims to improve grid stability and the reliability of the power supply.
L&T stated that this project will bolster its position within the energy storage sector. The company has previously secured several large-scale BESS projects, including a contract earlier this year for 6 GWh of storage capacity for a client in West Asia.
