L&T wins Gujarat battery storage project worth up to Rs 2,500 crore
Our main story on this: L&T secures Gujarat battery storage project worth up to Rs 2,500 crore
The company will develop a 300 MW energy storage system at Khavda using liquid-cooling technology.
Larsen & Toubro (L&T) has secured an order valued between Rs 1,000 crore and Rs 2,500 crore to build a battery energy storage system (BESS) in Khavda, Gujarat, according to reports by Financial Express, The Economic Times and Business Standard.
The project will be executed through a joint effort by the company's Renewables business and L&T Electronic Products & Systems (LTEPS). It features a power capacity of 300 MW and an energy storage capacity of 900 MWh, providing up to three hours of electricity supply.
The facility is designed to capture extra renewable power during high production periods and distribute it when electricity needs are at their highest. This process aims to improve the use of clean energy, bolster grid stability, and ensure a more dependable power supply.
The system will utilise liquid-cooling technology to achieve better power density, increased safety, and an extended operational lifespan. L&T stated in a regulatory filing that the facility will assist in improving grid flexibility and integrating more renewable energy into the national power network.
The company noted that this order will strengthen its position within the expanding energy storage market. L&T is a $32-billion multinational involved in engineering, procurement and construction (EPC), high-tech manufacturing, products and services.
