NGT orders demolition of pathway encroaching on Shahpura Lake
The tribunal has directed the removal of a 50-metre stretch allegedly built by filling the water body.
The National Green Tribunal (NGT) has ordered the immediate removal of a 50-metre-long pathway that was allegedly built by filling part of Shahpura Lake in Bhopal, according to The Times of India.
The tribunal initiated suo motu proceedings after seeing media reports regarding the degradation and encroachment of the lake. It has directed the Bhopal collector and the State Wetland Authority to measure the lake area, identify any encroachments, and take action against those found within the wetland.
A joint committee report identified the Madhya Pradesh Pollution Control Board (MPPCB) office and a government school as structures built by encroaching on the lake bank. The tribunal has asked authorities to measure these sites and act if the encroachments are confirmed.
The order also noted allegations that the Bhopal Municipal Corporation (BMC) used excavated material from a desilting operation to enlarge land area near the MPPCB office. The tribunal directed that the material used for the pathway must be moved beyond the 50-metre stretch or to designated landfills.
The sub-divisional officer (SDM) must file a personal affidavit confirming there are no encroachments within 33 metres of the Full Tank Level or in the prohibited zone, and that no untreated water is being discharged into the lake.
The tribunal, comprising Justice Sheo Kumar Singh and Dr Prashant Gargava, has listed the matter for a further hearing on December 8, 2026.
